719-963-2339 mgoddard3@msn.com Objective: * Project Scheduler with
Bristol Industries. As the project scheduler / schedule manager I would
bring standardization and a companywide tracking of all projects. Skills:
* Master Scheduling
* Project Management
* Primavera P3, P5e,
P6
* Contracts / Budget Execution * MS
Project 97, 2000,
2002
* Project Close Out
* Schedule Automation / Reports
Experience: *
Corporate Schedule Manager (December 2011 – Current) Hal Hays Construction ·
Corporate Schedule Manager responsible for developing, updating, and
reporting for all project schedules. Used Primavera 6 rel. 7 software. ·
Projects varied from offices, warehouses, roads, dormitories, medical
centers, airports runways, office buildings, highway overpass, sewer &
storm drain replacement, etc. ·
Worked with Estimating and Design Management departments to develop
proposal schedules and schedule narratives for proposal submittals. ·
Created schedule fragnets for contract modifications, to show their
impact, and to receive time extensions for the project. ·
Baselined all project schedules to track actual vs. baseline. ·
Responsible for creating the EPS and OBS structure and assigning user
privileges for projects. ·
Cost loaded project schedules and produced monthly project billings
for all Army Corps of Engineers and Navy Projects. ·
Developed reports for each region’s projects for upper management
review. Reports included project health stop light charts, baseline vs.
actual comparison, and milestone charts. *
Corporate Schedule Manager (April 2007 – November 2011) Tepa Construction In addition to the above tasks and
responsibilities the following were performed: ·
Projects varied from offices, warehouses, hangers, dormitories,
substations, medical centers, VA hospitals, office buildings, fire stations,
ranges, brigade headquarters, roads, sewer & storm drain replacement,
etc. ·
Baselined all project schedules to track actual vs. baseline. If
baseline and schedule performance index, (SPI) deviated too much, conducted a
recover plan meeting to address issues. ·
Developed corporate scheduling policy and procedures. ·
Responsible for scheduling department budget. ·
Developed corporate schedule training material, (10 levels and 500
pages), to teach and train all project managers and superintendents how to
develop, status, and produce reports for their projects. *
Program Scheduler (January 2002 – March 2007)
Booz Allen & Hamilton
Several Large DoD projects (3+B each) ·
Lead planner on new bomber acquisition, 2 new satellite acquisitions,
ballistic missile retrofit, and satellite ground stations maintenance and new
construction. Used both MS Project and Primavera scheduling software. ·
Integration of projects, (cost, resources, and risks) into the master
schedules ·
Transitioned a large satellite master schedule from MS Project to
Primavera 5e. ·
Conducted project Integrated Baseline Reviews to baseline program
master schedules. ·
Conducted project schedule review boards to resolve any proposed
changes to the baseline program milestones. ·
Presented project status briefings for project management boards and
project management reviews. ·
Developed innovative work breakdown structure and Network Diagram
charts which are color coded for each work group’s activities. ·
Worked on a team to develop custom automation for MS Project, (i.e.,
dynamically linked milestone charts, risk burn down charts, etc. with MS
Project). ·
Developed easy-to-read products to de-conflict maintenance activities
at satellite ground stations vs. scheduled launches for weekly delivery to
Air Force Satellite Control Network community. *
Project Scheduler / Assist. Project Manager (April 2000 –
December 2001)
DPR Construction, Inc.
Intel FAB23 Project, Colorado Springs, CO. (1.8B Build) ·
Tool Install Scheduler for the FAB23E ramp using Primavera 3. ·
Responsible for building and maintaining progress against schedule
graphs and reports in a MS Access database which imported data from the
Primavera base build schedule. ·
Responsible for closing out the tool install contracts and purchase
orders. ·
Close Out Manager for the projects punch list, O&M’s, warranties,
and as built drawings. *
Project
Manager (March 1999 – April 2000)
Fluor Corp
IBM CMOS 8S Project, Essex Jct., VT. (58M build)
·
Responsible for the project design reviews, bid openings, contract
awards. ·
Responsible for contract administration which included the project
budget, monthly invoices and billing. Reviewed and signed all trade
invoices, expense reports, and time cards. *
Assistant Project Manager / Scheduler (September 1998– March 1999)
ADPMARSHALL
IBM TMAH Project, Fishkill, NY (26M build) ·
Responsible for the project budget, RFI log, submittal log, drawings,
bid packages, LOA’s, and the projects punch list. ·
Responsibilities also included developing and maintaining the master
schedules in MS Project. Developed an actual vs. planned schedule for
the mechanical claim on Primavera, and was involved in settling the claim. *
Scheduler / Assistant MEP Coordinator (November 1997 – September
1998)
ADPMARSHALL
Intel RB1 Project, Hillsboro, OR (65M build) ·
Developed the master schedule for the project in Primavera, and
developed and maintained the projects micro schedule in MS Project ·
Assistant Superintendent for coordinating instrumentation &
controls, fire alarm, and security systems. ·
Responsible for all the Fire Stop systems on the project. ·
Construction supervisor for the Gowning Room build out. ·
Responsible for the punch list and close out of the project. *
Scheduler / Field Engineer (June 1996 – November
1997)
Marshall Contractors
Hyundai Semiconductor Facility, Eugene, OR. (1.2B build). ·
Responsible for developing and maintaining the projects micro schedule
in Primavera. ·
Responsible for punch list tracking and close out of the
project. Researched delays to the job due to weather, owner, design,
and subcontractors for litigation and claims. *
Scheduler (April 1996 – June 1996)
HCMS
Hyundai Semiconductor Facility, Eugene, OR. (320M build) ·
Developed the projects master schedule in Primavera. Responsible
for the projects procurement and equipment tracking logs. Education:
1994
Associate Degree in Mechanical Engineering (Lane Community
College)
1996
Bachelor Degree in Construction Engineering Management, Minor in Business
(Oregon State University) Certifications: Project Management Professional
(PMP) certification {since 2007} Certified Primavera 5e Certified Primavera 6 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|